Installation and pay attention to matters of a

  
cabinet, cabinet installation process

cabinet installation process is divided into the following steps: cabinet installation planning, preparation before cabinet installation, commissioning cabinet.

in various projects, room facilities are required, and the cabinet is one of the main facilities, so the cabinet installation is particularly important. The following describes the installation of the network cabinet in detail: The dimensions of the general cabinet are: height × width × depth = 1800mm × 600mm × 1000mm.

(. 1) Program

cabinet installation space of the first program prior to the installation cabinet, in order to facilitate heat dissipation and protection of facilities, with the front and rear cabinets from the wall or other facilities not less than 0.8 m The net height of the machine room cannot be less than 2.5 meters.

(2) preparation before

former cabinet installation, no space to correct errors, otherwise it will cause rework. Disassemble the cabinet and cabinet accessory packaging wooden box according to the unpacking guide.

(. 3) after the installation process enclosure

fixed enclosure, the enclosure may be performed directly mounting accessories. Place the cabinet in the planned position, confirm the front and rear of the cabinet, and aim the cabinet feet at the corresponding foot positioning marks.

(. 4) in the cabinet top of the cabinet debugging

simplest two mutually perpendicular directions leveling surface of the mounting feet, the standard view of the cabinet. Rotate the screw on the ground to debug the height of the cabinet to level the cabinet, and then lock the locking screw cap on the cabinet foot so that the locking screw cap fits snugly on the bottom of the cabinet.

two cabinet installation considerations have

relevant dimensions of the cabinet, and then check the appearance of the device, and to ensure that the selected scaffold match. A sturdy cabinet can hold nearly 500 kg, so check the tools used to take out the equipment, such as a door or trolley. Brand-name cabinets are usually equipped with wheels, so you only need to put the equipment in, and then push the cabinet to the right place.

measure the elapsed ceilings, doors and lift height size of the room and the cabinet. Then consider the multi-class equipment in the cabinet, and make sure that the cabinet is placed close to the power supply, network cable jack, and communication jack.

inspection opening and closing the cabinet when the door opening angle. The standard cabinet door opens on the right and the door shaft is on the left. Of course, the opposite is not ruled out. All doors and side panels should be easy to open for easy maintenance. When

when the user equipment cabinet of the cabinet into an existing group, can be arranged in a row next to the cabinet, so that safe, neat. The best cabinet group model should be fully expandable with all the necessary hardware to remove the cabinet side panels and screw the cabinets into a row.
Copyright © Windows knowledge All Rights Reserved